Finished drilling the longerons Posted on January 31, 2012 by dsetser Finished drilling the longerons today…lots ‘o drilling. Next up are trimming the longeron ends to accomodate the firewalll, and fabricating the shear ties that connect the longerons to the F-704 bulkhead.