Right elevator frame is finished

The right elevator horn riveted

The right elevator frame is finished, and here’s the only picture I took. (April 9, 2005 – Note from the future…when riveting the end ribs to the elevator spar, first rivet the two AN426 rivets that go forward and aft through the spar web and rib tab. Then finish the rivets that go laterally through the spar tab and rib web. That way you’ll have a little extra flexibility to get a squeezer into the spar web areas; the spar tab-to-rib web rivets make this a more difficult task)