Balancing Act

The last major task on my to-do list was balancing the elevators. Van’s instructions aren’t super clear on whether to do this before paint, but a call to Sterling at Van’s confirmed that the elevators must be balanced before first flight. Works for me.

I decided to put together a simple rig for balancing – two pieces of aluminum box extrusion trimmed and drilled at one end to accommodate elevator hinge bearings and bolts to hold them in place, both clamped to an aluminum work support. Here’s a pic –

Elevator balancing rig

The left elevator needed some weight and I had to remove some from the right elevator.

With balancing complete the elevators went back on the airplane and the airframe exterior is DONE!